Second Avenue Subway Tour

A sneak peek at a pictorial documentary of the Second Avenue Subway Project.
Second Avenue Subway Tour
Workers on the Second Avenue Subway project load a gigantic drill bit into the Drill Jumbo, which is used in the evening after blasting is halted to prepare sections of Manhattan schist for blasting the next day. Amal Chen/The Epoch Times
|Updated:
<a href="https://www.theepochtimes.com/assets/uploads/2015/07/Amal+Chen-20120307-IMG_5386.jpg"><img class="size-large wp-image-202519" title="Amal+Chen-20120307-IMG_5386" src="https://www.theepochtimes.com/assets/uploads/2015/07/Amal+Chen-20120307-IMG_5386-638x450.jpg" alt="" width="590" height="416"/></a>

Note: These are just a few of many pictures taken.This was a preliminary post before the full slideshow. Please click here for the full slideshow